Via Water from Valencia to Strasbourg

Transport of project cargo

Inland shipping and shortsea were chosen for the transport of a heavy project part.

The 135-ton part was loaded onto a coaster in the port of Muelle del Turia (Valencia) with the help of two mobile cranes.

Setting a course to Strasbourg using Inland Shipping

After six days, the ship arrived in the port of Antwerp, where the project goods were loaded at dock 1227.

The next day, this part was loaded onto the coaster Asdeta, which set a course to Strasbourg. Four days later, it was delivered.

In Antwerp and Strasbourg 2 mobile cranes were used.

Flowers Flowers